Front elevation cladding
West Bergholt
Photographed ten days apart in June 2023. The front door, windows and garage door are the same in both photos.
Real photos from our recent jobs across Colchester, North Essex and South Suffolk, from cladding and decking to flat roofs, interiors and garden buildings.
Select a photo to see it larger.
Each pair shows the same job, photographed at two stages of the work.
West Bergholt
Photographed ten days apart in June 2023. The front door, windows and garage door are the same in both photos.
Ardleigh
Photographed ten days apart in July 2023 from the rear garden. The cracked render on both gables is now clad.
Witham
The first photo was taken part-way through the work in June 2024, the second when finished in July 2024. The view through both windows matches.
Rowhedge
Photographed in September 2024. The old deck was stripped back to the joists, rebuilt and re-felted.
Colchester
Photographed in May and August 2024. The same front door, stone surround and railings appear in both photos.
Garden buildings
Our team set the floor bearers out on a concrete base, built the log walls course by course, then fitted the roof, windows and double doors.
Exteriors | West Bergholt
The red clay hanging tiles on the upper front of this detached house were replaced with sage-green horizontal cladding in June 2023.
Decking & landscaping | Clacton-on-Sea
A raised timber deck across the back of the house, with wide steps, built-in planters and a spindle balustrade, shown in daylight and at dusk.
Garden buildings | Coggeshall
A black timber-clad garden building on a brick plinth, with a corrugated roof and a glazed door and window. Inside, the timber roof structure is boarded and the building has lighting and power sockets.
Interiors | Colchester
A media wall finished in vertical slatted panelling, with a recess for the television, open alcove shelving either side and a lower recess for cables and sockets.
Interiors | Witham
A room with sash windows and panel mouldings, photographed part-way through the work in June 2024 and after redecoration, with wall lights and a pendant light in place.
Exteriors | Ardleigh
The cracked render on the twin rear gables of this house was covered with cream weatherboard cladding in July 2023.
Roofing | Rowhedge
The old flat roof deck was lifted, exposing rotten timber, then rebuilt with new timbers and boarding and finished in mineral felt in September 2024.
Decking & landscaping | North Essex
Square-lattice timber trellis panels fixed between timber posts along a garden border.
Exteriors | Aldham
The upper floor of this semi-detached house, shown before work began and with the scaffold, breathable membrane and new cladding boards on site in June 2023.
Paths & driveways | Colchester
An overgrown front bed and worn block path were replaced with a black and white mosaic tiled path, grey tiled areas either side and rope-top edging.
Garden buildings
Built on a timber base frame levelled on adjustable steel feet, this pent-roof garden office has anthracite grey windows, French doors and a side store.
Garden buildings
The frame was wrapped in breather membrane, insulated with foil-faced insulation and lined with plasterboard, then finished with double doors and a side store.
Tell us what you have in mind and we will arrange a free, no-obligation quote.